Not every flooring job is a wide-open production floor. Sometimes you're working under massive processing equipment with barely enough clearance to swing a trowel. That's exactly what this project looked like — and there wasn't an obstacle we couldn't handle.
The Challenge
Low clearance areas under heavy processing equipment. Tight spaces between conveyor legs, trench drains, and equipment pedestals. And a hard deadline — the floor had to be finished before the facility's next washdown schedule. Every minute counted.
The Approach
- Around-the-clock installation — our crew worked continuously to meet the washdown deadline
- SaniCrete STX — 3/8" stainless steel reinforced cementitious urethane in every accessible area
- Fast-cure sealcoat — critical for this timeline, allowing the floor to be ready for washdown on schedule
- Precision work around equipment — seamless transitions around pedestals, drains, and equipment legs
The Result
A seamless, sealed floor running under and around every piece of equipment in the area. The fast-cure topcoat meant the facility hit their washdown schedule with zero delays. Our crew doesn't back down from tight spaces or tight timelines — that's what we train for.
Products Used
- SaniCrete STX — 3/8" stainless steel reinforced cementitious urethane
- SaniCoat — Fast-cure sealcoat topcoat