More Than Just Floors: Complete Facility Transformation in 7 Days

3,500 SF production room — from underground plumbing to wall finishes — all in one shutdown

When people hear "flooring contractor," they think we show up, pour some material, and leave. This project was the opposite of that. A 3,500 square foot production room needed a complete transformation — and the facility gave us 7 days during a holiday shutdown to get it done.

Before & After

Before and after comparison of 3,500 SF production room — failed red floor transformed to seamless gray SaniCrete STX

The before tells the story. A failed red coating, delaminating across the room, with drainage issues and deteriorating curbing. The after: a seamless gray floor with new spot drains, fresh VR curbing, and coated walls — ready for another decade of production.

Day 1-2: Demo & Drainage

Crew cutting trench for new drain line installation in food processing production room

We started by removing the failed flooring and scarifying the substrate. But this project went deeper — literally. We cut the concrete slab and installed 7 new spot drains with underground plumbing to address the facility's chronic drainage problems. No more standing water. No more guessing where the water goes.

Day 3-5: Floor Installation

SaniCrete crew troweling fresh STX cementitious urethane across 3,500 SF production room

With drainage sorted, our crew installed SaniCrete STX across the entire 3,500 SF area. Every square foot hand-troweled to the correct slope, pitched to the new drain locations. The crew worked in sections, moving efficiently to keep the project on schedule.

Day 5-6: Curbing & Walls

Crew member hand-troweling SaniCrete VR cant cove curbing along wall in food processing facility

This is where "more than just floors" comes in. SaniCrete VR cant cove curbing was installed at every wall-to-floor transition, creating a seamless, sanitary connection that eliminates harborage points. Then we coated the walls up to the splash zone line — giving the facility a complete sanitary envelope from floor to wall.

Day 7: The Finished Room

Completed seamless gray SaniCrete STX floor with new spot drains and production equipment in food processing facility

On day 7, the room was done. 3,500 SF of seamless, USDA-compliant flooring with 7 new drains, VR curbing throughout, and coated walls. The facility was back in production on schedule. No extensions. No excuses. Just a completely transformed production room ready to perform.

Project Scope

  • Area: 3,500 SF production room
  • Timeline: 7-day holiday shutdown
  • Flooring: SaniCrete STX — stainless steel reinforced cementitious urethane
  • Curbing: SaniCrete VR — cant cove vertical curbing
  • Drainage: 7 new spot drains with underground plumbing
  • Walls: Prepared and coated to splash zone
  • Concrete: SaniCrete PC polymer concrete for slope correction

Have a Shutdown Window Coming Up?

We'll maximize every day. Get a free consultation and project timeline.

Get Your Free Quote →